-
City Services
-
Column 1
- Bids, RFPs & RFQs
- City Code
- Forms & Permits
- Start a Business
- Contracts
- Economic Development
- Project Management Dashboard
Column 2
Column 3
- Departments
- Executive
- Community & Economic Development
- Finance
- Human Resources
- Library
- Municipal Court
- Police
- Public Works
Column 4
-
-
Departments
-
Column 1
Column 2
- DEPARTMENTS
- Executive
- Community & Economic Development
Column 3
-
-
Community
-
Column 1
- About
- History
- Sweet Home Today
- Email Subscriptions
- Events and Activities
- Art Show in City Hall
- City Calendar
- Community Events
- Downtown Flags
- Sweet Home Farmers' Market
Column 2
- Chamber of Commerce
- Chamber Calendar
- Health Services
- Landlord & Tenant Resources
- Library
- Library Events
- Managed Outreach & Community Resource Facility
Column 3
- Public Safety
- Sweet Home Police Department
- Sweet Home Fire & Ambulance District
- Recreation
- Community Pool
- Parks and Recreation
- City Parks and Trails Directory
- Recreation Programs
Column 4
-
-
How Do I?
-
Column 1
- Apply for a Job
- Apply for a Passport
- Apply for a Special Event Permit
- Watch a Live-stream
- Contact the City
- Submit a Request or Concern
- View Staff Directory
Column 2
- Documents & Forms
- View Documents & Reports
- Adopted Budget
- View Forms & Applications
- File a Claim against the City
- Events & Meetings
- View Agendas & Minutes
- View Calendar
- Email Subscriptions
- View Press Releases
Column 3
- Report Storm Related Issues
- Report Streetlight Problem
- Report Water Main Breaks
- Volunteer
- View the Budget
Column 4
-
City Fees
The fee schedule was adopted by the Sweet Home City Council on July 1, 2023.
Jump to:
General Fees | City Recorder | Facility Rental Fees | Equipment Rental Rates | Other Facility Fees & Deposits
Community Development Fees | Temporary Recreation Vehicle Occupancy Permit
Park/Facility Use Processing Fees | Park Equipment Rental | Building Permit Fees
Manufactured Dwelling Permits | Demolition Permits | Solar Installation Specialty Code | Grading Permits | Mechanical Permit Fees | Plumbing Permits | Manufactured Home and Mobile Home/RV Parks
Police Department Fees | Library Services Fees | Finance Department | Public Works Fees | Engineering Fees
GENERAL FEES | |
---|---|
Photocopies Black and white 8.5 X 11 | .25 per side |
Color 8.5 X 11 | .50 per side |
Black and white 11 x 17 | .50 per side |
Color 11 x 17 | 1.00 per side |
Fax - local only | .25 per page |
Public Meeting Records - Audio CD | 5.00 each |
Packaging, Mailing and Postage | Actual Costs |
Returned Check Fee | $35.00 |
Recording Fees - Recording of Easements, Improvement Agreements and Liens | Current Linn County recording fees PLUS $10.00 administrative fee |
CITY RECORDER | |
Filing Fee for Declaration of Candidacy for an Elective Position | $10.00 |
Annual Subscription Mailed - City Council Packet | $240.00 |
Annual Subscription Mailed - City Council Agenda | $24.00 |
Annual Subscription Mailed - All Public Meeting Agendas | $36.00 |
Liquor License | |
Liquor License, New | $100.00 |
Liquor License, Temporary Sales | $35.00 |
Liquor License, Change of Ownership, Additional Privileges | $75.00 |
Liquor License, Renewal | $35.00 |
Hero Banner | $100.00 |
Veteran's Memorial Brick | $25.00 Paver, $35.00 Paver with Logo |
Taxi License Fee | $25.00 First Vehicle, $10.00 Each Vehicle Thereafter, fees for the remainder of the year. |
FACILITY RENTAL FEES | |
HOURLY FEES | |
Conference Rooms | Ames Santiam Wiley Council Chambers |
During Operating Hours | |
Government & Non-Profit Groups | $10/hr $15/hr $20/hr $25/hr |
Public Groups | $15/hr $20/hr $25/hr $30/hr |
Private Groups | $20/hr $25/hr $30/hr $35/hr |
During Hours of Closure | |
Government & Non-Profit Groups | $20/hr $30/hr $40/hr $50/hr |
Public Groups | $30/hr $40/hr $50/hr $60/hr |
Private Groups | $40/hr $50/hr $60/hr $70/hr |
Additional Facilities | |
City Hall Fenced Parking Lot | $5/day or $25/month per vehicle, plus $5/month to swap an additional vehicle in the same place. No overnight camping or RV parking. Not for vehicle storage. Must provide a waiver of liability. |
Library Parking Lot | $5/day or $25/month per vehicle, plus $5/month to swap an additional vehicle in the same place. No overnight camping or RV parking. Not for vehicle storage. Must provide a waiver of liability. |
EQUIPMENT RENTAL RATES | |
AV/IT System | $20.00 |
Tables and Chairs | Included |
Keurig Coffee Machine & Pods (15 Guests) | $10.00 |
PA System | $20.00 |
OTHER FEES AND DEPOSITS | |
Non-Refundable Fee (After Hours Use) | $50.00 |
Refundable Deposit for Non-profit, Govt & Public Groups | $100.00 |
Refundable Deposit for Private Groups/Businesses | $150.00 |
Refundable Key Deposit | $200.00 |
Non-Refundable Cleaning Fee | Included |
COMMUNITY DEVELOPMENT FEES | |
Packaging, Mailing and Postage | Actual Costs |
Annexation and Rezone | $1,500.00 |
Adjustments | $350.00 |
Appeal | $610.00 |
Compensation Claim Appeal SHMC 03.30.150 | Initial Deposit $1,000.00. Balance in Excess of Actual Cost to be Refunded. |
Comprehensive Plan Amendment | $1,500.00 |
Conditional Use (Public Hearing) | $650.00 |
Fence Permit | $25.00 |
Home Occupation | $200.00 |
Interpretations | $75.00 |
Land Use Compatibility Statement Sign-Off | $35.00 |
Measure 56 Mailing | Actual Notice Costs |
Nonconforming Uses | $650.00 |
Open Storage Permit | Non Refundable Fee of Zero Dollars Per Year |
Ordinance Legal Interpretation | $155.00 |
Other Land Use Decisions | Cost of Service ($150 deposit) |
Partition | $350.00 |
Planned Development - Tentative and Final | $1,000.00 + $25.00 per lot |
Planning Research and Letters | $60.00/hr.(1 hour minimum) |
Property Line Adjustment | $160.00 |
Property Line Adjustment Replat | $200.00 |
Secondary applications file concurrently | 50% of regular fee |
Site Development Review | $75.00 |
Subdivision - Tentative and Final | $1,000.00 + $25.00 per lot |
Transient Merchant Permit | $25.00 |
Vacation of Right of Way | $1,500.00 |
Variance (Public Hearing) | $650.00 |
Zone Map Amendment | $1,500.00 |
Zone Text Amendment | $1,500.00 |
Temporary Recreation Vehicle Occupancy Permit | |
See Resolution No. 3 for 2014 | |
0-7 days per rolling twelve (12) month period | No permit or permit fee required |
1-15 days per rolling twelve (12) month period | $50.00 - Permit Required |
Permit extension for period of time greater than that stated in the original permit not to exceed sixty (60) days based on a rolling twelve (12) month period | $35.00 - Permit Required |
1-60 days per rolling twelve (12) month period | $85.00 - Permit Required |
Park/Facility Use Processing Fees | |
Bandstand | $15.00/hour or $100.00 maximum; $100.00 refundable deposit |
Camping Sites | Tent Sites $30/day, RV Sites $60/day |
Community Garden Plots | $35.00/year |
Gazebo | $15.00/hour or $100.00 maximum; $100.00 refundable deposit |
Girl Scout Hut | $15.00/hour or $100.00 maximum; $100.00 refundable deposit |
Outdoor Event Center | $15.00/hour or $100.00 maximum; $100.00 refundable deposit |
Racquetball Court City Resident Individual | $50.00/year |
Racquetball Court City Resident Household | $75.00/year |
Racquetball Court Non-City Resident Individual | $75.00/year |
Racquetball Court Non-City Resident Household | $100.00/year |
Racquetball Court Employee Only | No Fee |
Racquetball Court Employee Household | $25.00/year |
Weddle Bridge | $15.00/hour or $100.00 maximum; $100.00 refundable deposit |
Equipment Rental | |
Items described below are subject to availability. A 24-hour notice is required before pick-up. Two-day maximum rental. | |
Table | $5.00/table $100.00 refundable deposit; Replacement cost $60.00 |
Chairs | $1.00/chair $100.00 refundable deposit; Replacement cost $35.00 |
2' Fold Up Barricade | $3.00/ Barricade; Replacement cost $35.00 |
2' Fold Up Plastic Barricades | $3.00/Barricade; Replacement Cost $48.00 |
8' Barricade | $3.00/Barricade; Replacement Cost $97.00 |
Small Barricade - "No Park" | $3.00/Barricade; Replacement Cost $40.00 |
Photo Cell Battery Light | $3.00/Light; Replacement Cost $40.00 |
18" Traffic Cones | $3.00/Cone; Replacement Cost $15.00 |
28" Traffic Cones with Reflective Strip | $3.00/Cone; Replacement Cost $20.00 |
Construction Signs with Sign Holders | $10.00/Sign; Replacement Cost $165.00 set |
Slow/Stop Paddle | $3.00/Each; Replacement Cost $30.00 |
Slow/Stop Paddle with 30" Handle | $5.00/Each; Replacement Cost $38.00 |
Slow/Stop Paddle with 60" Handle | $5.00/Each; Replacement Cost $21.00 |
Hydrant Wrench | $5.00/Each; Replacement Cost $35.00 |
Safety Vests | Replacement Cost $12.00 each |
Equipment Delivery/Pickup | $50.00 during business hours, $100.00 after hours |
BUILDING PERMIT FEES | |
Structural Permits | |
Building Permit Fees: Permit fees are based on the value of construction as per the most current ICC Building Valuation Table. | |
Total Value 1.00 to 500.00 | $50.00 |
Total Value 501.00 to 2,000.00 | 50.00 for the first 500.00 plus 2.52 for each additional 100.00 or fraction thereof, to and including 2,000.00 |
Total Value 2,001.00 to 25,000.00 | 87.80 for the first 2,000.00 plus 10.08 for each additional 100.00 or fraction thereof, to and including 25,000.00 |
Total Value 25,001.00 to 50,000.00 | 319.64 for the first 25,000.00 plus 7.56 for each additional 1,000.00 or fraction thereof, to and including 50,000.00 |
Total Value 50,001 to 100,000.00 | 508.64 for the first 50,00.00 plus 5.04 for each additional 1,000.00 or fraction thereof, to and including 100,000.00 |
Total Value 100,001.00 and up | 760.64 for the first 100,00.00 plus 4.00 for each additional 1,000.00 or fraction thereof |
Residential - One and Two Family, stand alone, Fire Suppression System - as noted in OAR 918-050-0140 | |
Use Structural Permit Fee valuation table above for Commercial Fire Suppression System permit fees | |
0 - 2,000 square feet | $100.00 |
2,001 - 3,600 square feet | $150.00 |
3,601 - 7,200 square feet | $200.00 |
Over 7,200 square feet | $250.00 |
Other Structural Inspections | |
Plan Review Fee | 65% of the Building Permit Fee |
Fire, Life, Safety Review | 40% of the Building Permit Fee |
Inspections outside of normal business hours under special circumstances with pre-arrangement - Two Hour Minimum | 100.00 per hour |
Inspections for which no fee is specifically indicated - One Hour Minimum | 65.00 per hour |
Re-Inspection Fee | 50.00 per inspection |
Additional Plan Review required by changes, additions, or revisions to approved plans - One Hour Minimum | 65.00 per hour |
Deferred Plans Submittal - Portions of a building design are allowed to be submitted separately. Does not apply to deferred permits. In addition to the project plan review fee based on total project value. | 65% of the building permit fee calculated using the value of the particular deferred portion or portions of the project with a minimum fee of 250.00 per deferral. Deferrals are defined by Plan Review Staff |
Structural Investigation Fee: In addition to the permit fee | Average or actual additional cost of ensuring compliance with this code and shall be in addition to required permit fees $100.00 Minimum |
Phased Permitting - Allows construction to begin on a portion or portions of a building before the construction documents for the whole building have been submitted. | |
Single family dwellings and duplexes - in addition to standard permit fees | $150.00 application fee per phase plus 10% of the total building permit fee not to exceed $1,500.00 |
All other structures - in addition to standard permit fees | $250.00 application fee per phase plus 10% of the total building permit fee not to exceed $1,500.00. |
3rd Party Plan Review per OAR 918-020-0090(3)(E) (customer contracted) - Administrative processing fee | 10% of the building permit fee, maximum fee of $250.00 |
Manufactured Dwelling Permits | |
Manufactured Dwelling Placement Fee: per installation (fee includes the concrete slab, runners or foundations, electrical feeder and plumbing connections and all cross-over connections, OAR 918-050-0130(1) - Fee includes inspection on items required at each site, installation, and final inspections. This fee does not include plumbing or electrical service installation permits fees. | $250.00 |
State Manufactured Dwelling and Cabana Installation Administrative Fee (per permit) | $30.00 |
Other Manufactured Dwelling Inspections | |
Inspections outside of normal business hours under special circumstances with pre-arrangememt - Two Hour Minimum | $100.00 per hour |
Inspections for which no fee is specifically indicated- One Hour Minimum | $65.00 per hour |
Re-inspection fee | $50.00 per inspection |
Additional plan review required by changes, additions, or revisions to approved plans - One Hour Minimum | $65.00 per hour |
Demolition Permits | |
Structural Removal Flat Fee | $50.00 |
Each Additional 1,000 sq. ft. or fraction thereof | $15.00 |
Plumbing Fixture Capping Fee | $20.00 per fixture |
Electrical Disconnect - PPL Responsibility | N/A |
Inspections for which no fee is specifically indicated - One Hour Minimum | $65.00 per hour |
Solar Installation Specialty Code | |
Engineered Systems Permit Fees: Permit fees are based on the market value of the work to be performed, including structural elements for the solar panels, including racking, mounting, rails and labor as per the most current ICC Building Valuation Table | |
See Structural Permit Fee valuation table for Permit Fee | |
Prescriptive Path Installations: As per the Oregon Solar Installation Specialty Code 305.4 (Includes plan review and one inspection) | $150.00 |
Plan Review for Engineered Systems | 65% of Permit Fee |
Inspections of Prescriptive Path Installations (after the first inspection) One Hour Minimum | $65.00 per Hour |
Grading Permits | |
10 cubic yards or less | No fee |
11 to 50 cubic yards | $23.50 |
51 to 100 cubic yards | $37.00 |
101 to 1,000 cubic yards | $37.50 for the first 100 cubic yards, plus $17.50 for each additional 1,000 cubic yards |
1,001 to 10,000 cubic yards | $194.50 for the first 1,000 cubic yards, plus $14.50 for each additional 1,000 cubic yards |
10,001 to 100,000 cubic yards | $325 for the first 10,000 cubic yards, plus $66.00 for each additional 10,000 cubic yards |
100,001 cubic yards or more | $919.00 for the first 100,000 cubic yards, plus $36.50 for each additional 10,000 cubic yards |
Grading Plan Review | |
50 cubic yards of less | No fee |
51 to 100 cubic yards | $23.50 |
101 to 1,000 cubic yards | $37.00 |
1,001 to 10,000 cubic yards | $49.25 |
10,001 to 100,000 cubic yards | $49.25 for the first 10,000 cubic yards plus $24.50 for each additional 10,000 cubic yards |
100,001 to 200,000 cubic yards | $269.75 for the first 100,000 cubic yards, plus $13.25 for each additional 10,000 cubic yards |
200,001 cubic yards or more | $404.25 for the first 200,000 cubic yards plus $7.25 for each additional 10,000 cubic yards or fraction thereof |
Other Grading Inspections | |
Inspections outside of normal business hours under special circumstances with pre-arrangement - Two Hour Minimum | $100.00 per hour |
Inspections for which no fee is specifically indicated - One Hour Minimum | $65.00 per hour |
Re-Inspection Fee | $50.00 |
Additional plan review required by changes, additions, or revisions to approved plans - One Hour Minimum | $65.00 per hour |
Mechanical Permit Fees | |
Residential Mechanical Permit | |
Minimum Permit Fee | $65.00 |
Installation/relocation forced air or gravity type furnace or burner, including attached ducts and vents, up to 100,000BTU | $25.00 |
Installation/relocation forced air or gravity type furnace or burner, including attached ducts and vents, over 100,000BTU | $30.00 |
Installation/relocation floor furnace | $20.00 |
Installation/relocation suspended heater | $20.00 |
Installation, relocation, or replacement of appliance vents not included in an appliance permit | $15.00 |
Repair of, alteration of, or addition to each heating, refrigeration, cooling, absorption, or evaporative unit or system, including controls | $20.00 |
Boiler or compressor up to 3 horsepower, or each absorption system up to 100,000 BTU/h | $20.00 |
Boiler or compressor over 3 and up to 15 horsepower, or each absorption system over 100,000 and up to 500,000 BTU/h | $25.00 |
Boiler or compressor over15 and up to 30 horsepower, or each absorption system over 500,000 and up to 1,000,000 BTU/h | $40.00 |
Boiler or compressor over 30 and up to 50 horsepower, over 500,000 and up to 1,750,000 BTU/h | $55.00 |
Installation or relocation of each boiler or refrigeration compressor over 50 horsepower or absorption system over 1,750,000 BTU/h | $55.00 |
Each air handling unit up to 10,000 cubic feet per minute, including attached ducts | $15.00 |
Each air handling unit exceeding 10,000 cfm | $25.00 |
Each evaporative cooler, other than portable types, air conditioning units and/or heat pumps | $20.00 |
Each ventilation fan connected to a single duct | $15.00 |
Each ventilation system which is not a portion of heating or air conditioning system authorized by permit | $20.00 |
Installation of each hood served by mechanical exhaust, including ducts | $20.00 |
Installation or relocation of each domestic type incinerator | $20.00 |
Each appliance or piece of equipment regulation by this code, but not classed in other applicant categories, or no other fee is listed. | $20.00 |
Fuel piping system with 1 to 4 outlets | $20.00 |
Fuel piping system with 5 or more outlets | $5.00 per outlet |
Other Mechanical Inspections | |
Mechanical Plan Review - Residential | 25% of Residential Mechanical Permit Fee |
Inspections outside of normal business hours (Two Hour Minimum) | $100.00 per/hour |
Inspections for which no fee is specifically indicated (One Hour Minimum) | $65.00 per hour |
Reinspection fee | $50.00 per inspection |
Additional plan review required by changes, additions, or revisions to approved plans (One Hour Minimum) | $65.00 per hour |
Mechanical Investigation Fee | Average or actual additional cost of ensuring compliance with this code and shall be in addition to required permit fees - $100.00 Minimum. |
Commercial Mechanical Permit Fees | |
Total Valuation $1.00 to $2,000.00 | $65.00 |
Total Valuation $2,001.00 to $25,000.00 | $65.00 for the first $2,000 plus $11.00 for each additional $1,000, or fraction thereof, to and including $25,000 |
Total Valuation $25,001.00 to $50,000.00 | $318.00 for the first $25,000 plus $9.00 for each additional $1,000, or fraction thereof, to and including $50,000 |
Total Valuation $50,001.00 to $100,000.00 | $543.00 for the first $50,000 plus $6.00 for each additional $1,000, or fraction thereof, to and including $100,000 |
Total Valuation $100,001.00 and up | $843.00 for the first $100,000 plus $4.00 for each additional $1,000, or fraction thereof |
Other Commercial Mechanical Inspection | |
Mechanical Plan Review - Commercial | 25% of the Commercial Mechanical permit fee |
Reinspection Fee | $50.00 per inspection |
Inspections outside of normal business hours - Two Hour Minimum | $100.00 per hour |
Inspections for which no fee is specifically indicated - One Hour Minimum | $65.00 per hour |
Additional Plan Review required by changes, additions, or revisions to the approved plans - One Hour Minimum | $65.00 per hour |
Mechanical Investigation Fee | Average or actual additional cost of ensuring compliance with this code and shall be in addition to required permit fees - $100 Minimum |
Plumbing Permits | |
Residential Plumbing Permit Fees | |
Minimum Permit Fee | $90.00 |
Plan Review, if required | 30% of permit fee |
Water Service/Building Sewer/Storm Sewer | |
Water service - first 100 feet or fraction thereof | $50.00 |
Water service - each additional 100 feet of fraction thereof | $30.00 |
Sanitary sewer - first 100 feet or fraction thereof | $50.00 |
Sanitary sewer - each additional 100 feet of fraction thereof | $30.00 |
Storm sewer (includes rain drain and footing) - first 100 feet of fraction thereof | $50.00 |
Storm sewer (includes rain drain and footing) - each additional 100 feet of fraction thereof | $30.00 |
New One- and Two-Family Dwellings | |
Includes one kitchen, first 100 feet of water and sewer, hose bibs, ice maker, underfloor low-point drains, and rain-drain packages (including piping, gutters, downspouts and perimeter system) | |
1 Bath | $260.00 |
2 Bath | $320.00 |
3 Bath | $370.00 |
Each additional bathroom in addition to 3 | $80.00 |
Each additional kitchen in addition to 1 | $80.00 |
Fixture Fee | $20.00 |
Backflow preventer / Backwater Valve | $40.00 |
One- and Two-Family Continuous Loop/Multipurpose Fire Suppression System Permit as noted in OAR 918-050-0140 | |
0 - 2000 square feet | $100.00 |
2001 - 3600 square feet | $150.00 |
3601 - 7,200 square feet | $200.00 |
Over 7,200 square feet | $250.00 |
Manufactured Homes Utilities- sewer collection and water distribution | $110.00 |
Commercial Plumbing Permit | |
Commercial, Industrial | |
Minimum Fee | $150.00 |
Site Utilities for Water / Sanitary / Storm Sewer (exterior of foundation) trench drains (length of pipe): | |
First 100 feet or fraction thereof | $80.00 |
Each additional 100 feet of fraction thereof | $40.00 |
Storm water retention / detention tank / facility - Flat Fee | $80.00 |
Pressure reducing valve | $25.00 |
Fixture cap | $25.00 |
Man holes | $25.00 |
Catch basin or area drain | $25.00 |
Absorption valve | $25.00 |
Bath tub/shower/shower pan | $25.00 |
Clothes washer | $25.00 |
Dishwasher | $25.00 |
Drinking fountain | $25.00 |
Expansion tank | $25.00 |
Fixture cap | $25.00 |
Floor or roof drain / floor sink / hub | $25.00 |
Garbage disposal | $25.00 |
Hose Bib | $25.00 |
Ice maker | $25.00 |
Interceptor / grease trap | $25.00 |
Laundry tray | $25.00 |
Sink / basin / lavatory | $25.00 |
Trap primer | $25.00 |
Water closet / urinal | $25.00 |
Water heater | $25.00 |
Other fixture | $25.00 |
Backflow Preventer/Backflow Valve | $80.00 |
Plan Review, if required | 30% of Permit Fee |
Manufactured Dwelling Parks / RV Parks - Per Space/Site Fee | $70.00 |
Medical Gas Piping - Fee based upon value (Plan Review Required) | |
Valuation $1.00 - $2,000.00 | $75.00 |
Valuation $2,001.00 - $25,000.00 | $75.00 for first $2000.00 + $12.00 for each additional $1,000 or fraction thereof, to and including $25,000.00 |
Valuation $25,001.00 - $50,000.00 | $351.00 for first $25,000 + $10.00 for each additional $1,000 or fraction thereof, to and including $50,000.00 |
Valuation $50,001.00 - $100,000.00 | $601.00 for first $50,000 + $6.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 |
Valuation $100,000.00 and up | $901.00 for first $100,000 + $4.00 for each additional $1,000 or fraction thereof |
Other Plumbing Inspection - Residential & Commercial | |
Re-inspections | $90.00 per inspection |
Inspections outside of normal business hours - Under special circumstances with pre-arrangement - Three Hour Minimum | $160.00 per hour |
Inspections for which no fee is specifically indicated - One Hour Minimum | $90.00 per hour |
Additional Plan Review required by changes, additions, or revisions to the approved plans. One Hour Minimum | $90.00 per hour |
Plumbing Investigation Fee | Average or actual additional cost of ensuring compliance with this code and shall be in addition to required permit fee - $100 Minimum |
Manufactured Home and Mobile Home/RV Parks [1] | |
OAR 918-600-0030 | |
Valuation $1.00 to $500.00 | $15.00 |
Valuation $501.00 to $2,000.00 | $15.00 for first $500 plus $2.00 for each additional $100 or fraction thereof, to and including $2,000 |
Valuation $2,001.00 to $25,000.00 | $45.00 for first $2,000 plus $9 for each additional $1,000 or fraction thereof, to and including $25,000 |
Valuation $25,001.00 to $50,000.00 | $252.00 for first $25,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $50,000 |
Valuation $50,001.00 to $100,000.00 | $414.50 for first $50,000 plus $4.50 for each additional $1,000 or fraction thereof, to and including $100,000 |
Valuation $100,001.00 to $500,000.00 | $639.50 for first $100,000 plus $3.50 for each additional $1,000 or fraction thereof, to and including $500,000 |
Valuation $500,001.00 to $1,000,000.00 | $2,039.50 for first $500,000 plus $2 for each additional $1,000 or fraction thereof, to and including $1,000,000 |
Valuation of $1,000,001.00 and up | $3,539.50 for first $1,000 plus $2 for each additional $1,000 or fraction thereof |
Other Inspections | |
Re-inspection Fee | $50.00 per inspection |
Inspections outside of normal business hours Two Hour Minimum | $50.00 per hour |
Inspections for which no fee is specifically indicated - One-Half Hour Minimum | $50.00 per hour |
Additional Plan Review required by changes, additions, or revisions to the approved plans One-Half Hour Minimum | $50.00 per hour |
Consultation Fee - One Hour Minimum | $30.00 per hour |
[1]This permit does not include permits or related fees for park facilities constructed under building, mechanical, plumbing, electrical or manufactured dwelling placement permits. | |
Manufactured Dwelling / Mobile Home / RV Park Valuation Table | |
Table 2 | |
Park Class A | | Park Class B | Park Class C |
Space per Acre 4 | 5,901 | | 5,504 | 5,312 |
Space per Acre 5 | 5,517 | | 5,120 | 5,028 |
Space per Acre 6 | 5,197 | | 4,800 | 4,608 |
Space per Acre 7 | 4,941 | | 4,544 | 4,352 |
Space per Acre 8 | 4,685 | | 4,288 | 4,269 |
Space per Acre 9 | 4,493 | | 4,096 | 3,904 |
Space per Acre 10 | 4,365 | | 3,968 | 3,776 |
Space per Acre 11 | 4,301 | | 3,904 | 3,712 |
Space per Acre 12 | 4,237 | | 3,804 | 3,648 |
Class A = parks contain paved streets curbs & sidewalks | |
Class B = parks contain paved streets no curbs no sidewalks | |
Class C = parks contain no paved streets, no curbs but have sidewalks on one side or each street | |
When a park contains spaces in more than one class, figure the spaces in each class; then add them together to obtain the total valuation of the park. | |
Plan Review fee is 65% of permit fee. | |
POLICE DEPARTMENT FEES | |
Photo Copies | .25 per side |
Bicycle License per bicycle - current owner | $2.00 |
Peddler License Applications | $25.00 |
Alarm Permit | $5.00/year (fee waived for residential occupants over the age of 65) |
Public Fingerprinting Services (Two Cards) | |
Residents | $20.00 |
Non-Residents | $30.00 |
False Alarm Fees | |
1st and 2nd Alarm | No Charge |
3rd and 4th Alarm | $25.00 |
5th and 6th Alarm | $50.00 |
7th + Alarm | $100.00 |
Reports and Recordings | |
Research Fee per unknown case number | $10.00 |
Archived Reports prior to 2001 or reports requiring redaction of confidential information: | Actual Staff Costs - 1 hour minimum Applicable reproduction cost |
Incident Reports (up to 25 pages) | $10.00 |
Additional pages | $0.50 |
Report postage minimum up to 10 pages | $3.00 |
Additional pages | .10/each |
Evidence Recording (digital audio) | |
Digital Audio | $30.00 |
Video (minimum up to 2 hours maximum) | $50.00 |
Each additional 2 hours | $50.00 |
Recording postage per CD/DVD | $5.00 |
Evidence Photographs | |
Film converted to digital | $50.00 |
Photos per case CD/DVD or sent electronically | $25.00 |
Digital printed photos per sheet (max 4/sheet) | $10.00 |
Photograph Postage | |
Postage per photo CD | $5.00 |
Postage min to 10 printed pages | $5.00 |
Per pages after 10 | $0.10 |
Record Checks | |
Letters of Clearance (per individual) | $15.00 |
Location/Person overview per individual | $10.00 |
Postage for records checks minimum to 10 pages | $2.00 |
Per page after 10 | $0.10 |
License Investigations | |
Second Hand Dealer License Processing | $20.00 |
Texas Hold-Em License (annual) | $200.00 |
Social Games | $25.00 |
LIBRARY SERVICES FEES | |
Photocopies Black and white 8.5 X 11 (self service) | .15 per side |
Color 8.5 X 11 (self service) | .50 per side |
Library Lost/Destroyed Materials | |
Lost Library Card Replacement Fee | $3.00 |
Lost/Destroyed Library Materials | Actual replacement cost plus 5.00 processing fee |
Out of City Library Card | |
Per household and/or single card per year issued | $35.00 |
FINANCE DEPARTMENT | |
Miscellaneous Service and Research Fees | |
Budget Document (bound copy) Available online | $15.00 |
Audit/CAFR Document (bound copy) Available online | $15.00 |
Municipal Lien Search Fee per Tax Lot | $30.00 |
Reconveyance Fee | $160.00 |
Packaging, Mailing and Postage | Actual Costs |
Passport Processing Fees/each | $35.00 |
Passport Photographs - 1 set of two | $15.00 |
Water Service Fees | |
Utility Shut off Notice/Doorhangers | $25.00 |
Reinstating Water Service | $40.00 |
Turning water service on that has been turned off without permit | $40.00 |
Turning off and turning on water service after hours | $100.00 |
Turning off and turning on water service during regular hours | $20.00 |
Re-reading the water meter at request of the user | $20.00 |
Reinstallation of water meters at the request of the user | $200.00 |
Vacationers' water on/off | 20.00 each visit |
Tampering with a water meter | $250.00 |
Utility Account Deposit | $150.00 |
Utility Account Set Up Fee (non-refundable) | $20.00 |
Temporary Water Service Fee | $40.00 |
Late fee for delinquent accounts | 5.00/per month |
Interest rate on outstanding delinquent account balance including all interest, service charges, or other relevant fees/charges | 1.5%/per month |
Refunds will not be made for amounts less than | $10.00 |
User Rates for City Storm Drainage System | |
Customer Charge Equivalent Dwelling Unit (3,200 sq. ft) | $0.20 |
Commodity Charge EDU | $0.80 |
PUBLIC WORKS FEES | |
PW Permit Fees | |
Basic Right-of Way Permit (includes sidewalk reconstruction/repair, sidewalk new construction behind existing curb, tree removal, and heavy haul routes; fee doubles upon incurring damage). |
$60.00 |
Recording of Easements and Improvement Agreements. (Not subject to basic permit fee if no other right-of-way work being done. | Linn Co. Fee + $10.00 Administrative Fee |
Meter only in Subdivision Lots | $350.00 |
Utility Franchise Permit: Fees Governed by Individual Utility Franchise Agreements. | |
Service Connection Inspection Fees (Typical of Residential & Small Commercial Construction) | |
Driveway Access (new/widen/reconstruction) | $30.00 |
Driveway Culvert (new/extension) | $20.00 |
Sewer Lateral Connection to Main | $30.00 |
Storm Drainage Connection to Curb, Main, or Channel | $10.00 |
Connection to City Water System when Installed by a Contractor | $60.00 |
Infrastructure Inspection Fees (Typical of Subdivision and Large Commercial Construction) | |
"1000 lf incr" means per 1000 Linear Feet Increment | |
Half Street Improvements | $100.00 Per 1000 lf incr |
Full Street Improvements | $350.00 Per 1000 lf incr |
Storm Sewer Mainline (new or extended) | $60.00 Per 1000 lf incr |
Sanitary Sewer Mainline (new or extended) | $150.00 Per 1000 lf incr |
Water Mainline (new or extended), Private Fire Supply Line or Service Which Required Public Testing | $300.00 Per 1000 lf incr |
Stormwater Management - Water Quality/Detention/Retention/Open Channel/Swale | $60.00 |
Development Plan Review up to 5 Hours | $350.00 |
Development Plan Review over 5 Hours | $60.00/hr |
Erosion Control Plan Review | |
Parcel 10,000 sq. ft to 43,559 sq. ft (1 Acre) | $50.00 |
Over 1 Acre w/o Erosion Control Certificate | $75.00 |
Industrial Waste Pretreatment | |
Discharge Application Review | $100.00 |
Discharge Permit | $100.00 |
Monitoring & Inspection | Cost or $30.00 Min |
Response to Accidental Discharge | Cost or $30.00 Min |
Filing Appeals | Cost or $30.00 Min |
Administration for Abatement Procedures | $25.00 |
Bulk Water Service Fees | |
Hydrant Meter Deposit (refundable) | $1,650.00 |
Bulk Water Permit Base Fee | $60.00 |
Bulk Water Commodity Fee | See Bulk user rate as per Water Utility Fees resolution |
System Development Charges and Utility Assessments | |
effective 07/01/2022 per Resolution No. 9 of 2021 | |
Water SDC, ¾" meter | $3,909.00 |
Water SDC, 1" meter | $9,772.00 |
Water SDC, 1.5" meter | $19,544.00 |
Water SDC, 2" meter | $31,270.00 |
Water SDC, 3" meter | $62,540.00 |
Water SDC, 4" meter | $97,719.00 |
Water SDC, 6" meter | $195,438.00 |
Sanitary Sewer SDC, based on ¾" water meter | $3,074.00 |
Sanitary Sewer SDC, based on 1" water meter | $7,685.00 |
Sanitary Sewer SDC, based on 1.5" water meter | $15,369.00 |
Sanitary Sewer SDC, based on 2" water meter | $24,591.00 |
Sanitary Sewer SDC, based on 3" water meter | $17,494.00 |
Sanitary Sewer SDC, based on 4" water meter | $28,295.00 |
Sanitary Sewer SDC, based on 6" water meter | $46,074.00 |
Foster Midway Sewer Assessment | $900.00 |
Fed Fund EPA #C-410432-02-2 or EDA #07-51-23386 | |
Transportation SDC | $0.00 |
Stormwater SDC | $0.00 |
Parks SDC | $0.00 |
Water Service Site Installation by City | |
Water Service Installation by City, 3/4" Meter, through Asphalt/Concrete | $2,500.00 |
Water Service Installation by City, 3/4" Meter, through Gravel/Soil | $2,100.00 |
Water Service Installation by City, 1" Meter, through Asphalt/Concrete | $2,600.00 |
Water Service Installation by City, 1" Meter, through Gravel/Soil | $2,200.00 |
Water Service Installation by City, 1.5" Meter, through Asphalt/Concrete | $2,800.00 |
Water Service Installation by City, 1.5" Meter, through Gravel/Soil | $2,500.00 |
Water Service Installation by City, 2" and larger Meter & Service | Project Specific w/ Const. |
Water Service Installation by City, Custom Non-standard Installation, various meter sizes | Time and Materials |
Engineering Document Plan Copies | |
Size | Paper/Photo |
18 X 24 | 2.50/5.00 |
24 X 36 | 4.00/8.00 |
36 X 48 | 8.00/16.00 |
Electronic Data Files | |
GIS Aerial Photographs, .SID or .TIF | 20.00 / per image (1/4) section |
GIS Attributed Vector Data, .SHP | 20.00/per layer |
AutoCAD Electronic Data Files, .DWG or .DWF | 20.00/per requested area |
Custom map work in increments of 1/4 hour, subject to staff availability | 60.00/hour + printing fees |